Our Project Credentials

Since our establishment in 1996, we have conducted more than 100 assignments in Indonesia and throughout Asia, including high profile, multi-year assignments valued at over USD 8 million. The firm has served clients in a dozen countries throughout the Asia-Pacific region, including multilateral agencies, such as The World Bank and the Asian Development Bank (ADB), Bilateral agencies such as AFD, DFID,KfW and USAID, State-owned enterprises and Multinational corporations.

Sectors
type of clients
TYPE OF SERVICES
Projects Size
2021-2026 | DEVELOPMENT INSTITUTION

Sustainable Energy for Indonesia’s Advancing Resilience (SINAR)

Project size LARGE

Indonesia

Read More Arrow Right
2021 | DEVELOPMENT INSTITUTION

Support for the Development of a Sustainable Vision and Pathway for the Indonesia Power Sector focus on least-cost planning and energy transition sections

Project size SMALL

Indonesia

Castlerock delivered a World Bank report to assist the World Bank Team in engaging and advising the Government of Indonesia in the formulation of a compelling and sustainable medium/long-term vision for the country’s power sector. The assignment is divided into three stages: Stage I: Review of the power sector’s situation: This stage was comprised...

Read More Arrow Right
2020-2021 | DEVELOPMENT INSTITUTION

Electric Transportation and Charging Infrastructure – Energy Policy Specialist

Project size SMALL

Indonesia

Under ADB TA-6583 implemented over 2020-2021, Castlerock provided electric vehicle analysis and roadmap formulation, data gathering and interpretation regarding electric two-wheeler and charging infrastructure, policy review on electric two-wheeler and charging infrastructure deployment in Indonesia.

Read More Arrow Right
2020-2021 | DEVELOPMENT INSTITUTION

Determining the Value of the proposed Indonesia Upper Cisokan Pumped Storage Hydroelectric Power Project

Project size LARGE

Java

The Upper Cisokan Pumped Storage (UCPS) Hydroelectric Power Project will be Indonesia’s first pumped storage project, with total generating capacity of 1,040 MW. The World Bank together with AIIB served as primary funders of the project via large scale sovereign lending facilities to PLN. From 2020-2021, Castlerock, together with its subcontractors ECA and Quadran,...

Read More Arrow Right
2020-2022 | DEVELOPMENT INSTITUTION

Supporting Sustainable and Efficient Energy Policies and Investments in Indonesia (SSEEPI)

Project size LARGE

Indonesia

Under ADB TA 9777-INO from 2020 until 2022, Castlerock provided the Team Leader for the assignment and was responsible for overall delivery of the project. He provided technical inputs for the PBL component, particularly related to the presidential regulation on renewable energy, led the design and implementation of the solar park component, and prepared...

Read More Arrow Right
Loading