2017-2018 | PRIVATE DEVELOPER

Sulawesi

Pre-Feasibility Study and Feasibility of Waste-to-Energy Project in the City of Bau-bau and in the Regency of Bima

Castlerock conducted for project developers PT. Kaltimex Energy, a 2017-2018 prefeasibility study a $20 million Waste-to-Energy project to be executed on a BOOT basis. The project specification included Pyrolysis and/or fermentation process technology.