2016 | PRIVATE DEVELOPER

Singapore

GHG Emissions Calculation for Waste-to-Energy Plant in Tuas

Castlerock, in 2016, undertook a calculation of GHG Emission for Singapore’s 6th waste to energy plant  for Enviro/Pro, the Environmental and Social  consultant for the TuasOne project operated as a 25 year BOT concession under ownership of Mitsubishi Heavy Industries. The plant capacity was 3600 tonnes per day of waste throughput The scope of the assignment included direct and indirect emissions and was needed to meet financier requirements under Equator Principles III.