Kredensial Proyek Kami

Sejak didirikan pada tahun 1996, kami telah melakukan lebih dari 100 proyek penugasan di Indonesia dan di seluruh Asia, termasuk penugasan tahunan yang bernilai tinggi dengan nilai proyek lebih dari USD 8 juta. Perusahaan kami telah melayani klien lebih dari 12 negara di seluruh kawasan Asia-Pasifik, termasuk lembaga multilateral, seperti World Bank dan Asian Development Bank (ADB), lembaga bilateral seperti AFD, DFID, KfW dan USAID, perusahaan milik negara dan perusahaan multinasional.

Sektor
Tipe Klien
Tipe Layanan
Ukuran Proyek
2014-2015 | PEMERINTAH & UTILITAS

KPMG PIP Geothermal (Loan Appraisal Services to the Geothermal Fund Facility (GFF) in Pusat Investasi Pemerintah (PIP), Indonesia)

Project size MEDIUM

Indonesia

Castlerock Consulting provided 2014-2015 loan appraisal service to Pusat Investasi Pemerintah (PIP) / DFID for potential geothermal exploration related to the Geothermal Fund Facility. Castlerock Consulting was responsible for all technical aspects required including: Reviewing the loan appraisal methodology in the GFF Management Manual from a technical perspective and, if necessary, providing inputs and...

BACA SELENGKAPNYA Arrow Right
2014 | PEMERINTAH & UTILITAS

Electricity Tarif Study

Project size KECIL

Java and Bali

This Castlerock  2014 study for Ernst & Young Shihon LLC provided a glimpse of the future of Java Bali electricity system for potential investors’ consideration. The study focused on  the existing tariff structure, demand and demand forecast, economic least cost generation plan along with the investment program which will make a basis for the...

BACA SELENGKAPNYA Arrow Right
2014 | PEMERINTAH & UTILITAS

Advisory Services to Assess Forex Impacts on PLN’s Financial Condition

Project size KECIL

Indonesia

Castlerock developed a financial model to PLN with the following features and components, and analyzed the impact of future exchange rate and macroeconomic scenarios on PLN’s financial condition: The model calculates PLN EBITDA as a proxy for the Government of Indonesia’s subsidy obligation to PLN. Running the model for actual data for 3 years...

BACA SELENGKAPNYA Arrow Right
2014 | LEMBAGA PENGEMBANGAN

Capacity Building for Installers and System Designers for Solar PV Rooftop Installations

Project size MEDIUM

Indonesia, Thailand, Malaysia, the Philippines and Vietnam

This APEC 2014 Program was focused on Indonesia, Thailand, Malaysia, the Philippines and Vietnam. The fast and steady growth of Solar PV installations worldwide highlighted several problems that  affected the reliability and efficiency of such systems, especially for rooftop installations. In South East Asian countries in particular, installers and system designers of Solar PV...

BACA SELENGKAPNYA Arrow Right
2014 | LEMBAGA PENGEMBANGAN

Master Plan on ASEAN Connectivity Implementation-Borneo-Mindanao Power Interconnection GIS Specialist

Project size KECIL

Kalimantan

Under this ADB 2014 assignment, Castlerock  set up a geospatial mapping platform to analyze load centers, existing T&D infrastructure, major land use zones, areas of biodiversity and reserve forests, key landforms that needed to be taken into account while planning interconnections and prepared alternate high-level renditions of possible alignments for the proposed priority interconnections....

BACA SELENGKAPNYA Arrow Right