Sejak didirikan pada tahun 1996, kami telah melakukan lebih dari 100 proyek penugasan di Indonesia dan di seluruh Asia, termasuk penugasan tahunan yang bernilai tinggi dengan nilai proyek lebih dari USD 8 juta. Perusahaan kami telah melayani klien lebih dari 12 negara di seluruh kawasan Asia-Pasifik, termasuk lembaga multilateral, seperti World Bank dan Asian Development Bank (ADB), lembaga bilateral seperti AFD, DFID, KfW dan USAID, perusahaan milik negara dan perusahaan multinasional.

Sektor
Tipe Klien
Tipe Layanan
Ukuran Proyek
2011-2015 | PEMERINTAH & UTILITAS

Project Management & Quality Assurance (PMQA)

Project size BESAR

Indonesia

Under this World Bank funded assignment for Indonesia Ministry of Finance from 2011 to 2015, Castlerock worked as client-side advisor to Ministry of Finance to successfully implement Indonesia’s new state treasury and budget system, Sistem Perbendaharaan dan Anggaran Negara (SPAN). SPAN will serve as the Government of Indonesia’s financial management backbone, ultimately connecting all...

BACA SELENGKAPNYA Arrow Right
2011 | LEMBAGA PENGEMBANGAN

Pre-feasibility Study of Efate Geothermal Power Plant and Island Ring Grid Development Program

Project size BESAR

Vanuatu

The objectives of the World Bank 2011  assignment were to: (i) define and cost at a conceptual level the principal technical options for geothermal power generation and associated transmission and distribution in Efate, Vanuatu (ii) determine the economically optimal option, taking into account both the potential for displacing diesel generation in the Port Vila...

BACA SELENGKAPNYA Arrow Right
2011-2015 | LEMBAGA PENGEMBANGAN

Indonesia Clean Energy Development (ICED)

Project size BESAR

Sumatra

Under USAID 2011-2015 program, the Indonesian Clean Energy Development project (ICED) assisted the Government of Indonesia (GOI) in designing and implementing results-oriented Clean Energy (CE) development programs at the national and local levels. The objective of the project was to accelerate the use of small scale clean energy supply (<10 MW) power generation: Biomass,...

BACA SELENGKAPNYA Arrow Right
2010-2011 | LEMBAGA PENGEMBANGAN

Existing National and Local Financing in Indonesia

Project size KECIL

Indonesia

Under this 2010-2011 GTZ PAKLIM study, Castlerock identified the appropriate financing options  based on the existing instruments, as well as recommendation of other possible options. One of the deliverables of this assignment is a Directory of Financing Sources for Mitigation Actions for Local /City Government (Direktori Pembiayaan Aksi Mitigasi di Perkotaan).

BACA SELENGKAPNYA Arrow Right
2010-2011 | LEMBAGA PENGEMBANGAN

Development and Implementation of Pricing and Incentive Policy to Address Incremental Costs of Geothermal Power Development

Project size BESAR

Indonesia

This World Bank-financed assignment from 2010 until 2011  formulated and helped the Government of Indonesia to implement policies, pricing mechanisms and regulations to promote the investment in geothermal power projects necessary to meet Government targets. The assignment entailed:  Confirmation of geothermal resources at 50 potential geothermal fields, Evaluation of levelized power production costs at...

BACA SELENGKAPNYA Arrow Right