Kredensial Proyek Kami

Sejak didirikan pada tahun 1996, kami telah melakukan lebih dari 100 proyek penugasan di Indonesia dan di seluruh Asia, termasuk penugasan tahunan yang bernilai tinggi dengan nilai proyek lebih dari USD 8 juta. Perusahaan kami telah melayani klien lebih dari 12 negara di seluruh kawasan Asia-Pasifik, termasuk lembaga multilateral, seperti World Bank dan Asian Development Bank (ADB), lembaga bilateral seperti AFD, DFID, KfW dan USAID, perusahaan milik negara dan perusahaan multinasional.

Sektor
Tipe Klien
Tipe Layanan
Ukuran Proyek
2021-2026 | LEMBAGA PENGEMBANGAN

Sustainable Energy for Indonesia’s Advancing Resilience (SINAR)

Project size BESAR

Indonesia

BACA SELENGKAPNYA Arrow Right
2021 | LEMBAGA PENGEMBANGAN

Support for the Development of a Sustainable Vision and Pathway for the Indonesia Power Sector focus on least-cost planning and energy transition sections

Project size KECIL

Indonesia

Castlerock delivered a World Bank report to assist the World Bank Team in engaging and advising the Government of Indonesia in the formulation of a compelling and sustainable medium/long-term vision for the country’s power sector. The assignment is divided into three stages: Stage I: Review of the power sector’s situation: This stage was comprised...

BACA SELENGKAPNYA Arrow Right
2020-2021 | LEMBAGA PENGEMBANGAN

Electric Transportation and Charging Infrastructure – Energy Policy Specialist

Project size KECIL

Indonesia

Under ADB TA-6583 implemented over 2020-2021, Castlerock provided electric vehicle analysis and roadmap formulation, data gathering and interpretation regarding electric two-wheeler and charging infrastructure, policy review on electric two-wheeler and charging infrastructure deployment in Indonesia.

BACA SELENGKAPNYA Arrow Right
2020-2021 | LEMBAGA PENGEMBANGAN

Determining the Value of the proposed Indonesia Upper Cisokan Pumped Storage Hydroelectric Power Project

Project size BESAR

Java

The Upper Cisokan Pumped Storage (UCPS) Hydroelectric Power Project will be Indonesia’s first pumped storage project, with total generating capacity of 1,040 MW. The World Bank together with AIIB served as primary funders of the project via large scale sovereign lending facilities to PLN. From 2020-2021, Castlerock, together with its subcontractors ECA and Quadran,...

BACA SELENGKAPNYA Arrow Right
2020-2022 | LEMBAGA PENGEMBANGAN

Supporting Sustainable and Efficient Energy Policies and Investments in Indonesia (SSEEPI)

Project size BESAR

Indonesia

Under ADB TA 9777-INO from 2020 until 2022, Castlerock provided the Team Leader for the assignment and was responsible for overall delivery of the project. He provided technical inputs for the PBL component, particularly related to the presidential regulation on renewable energy, led the design and implementation of the solar park component, and prepared...

BACA SELENGKAPNYA Arrow Right
Loading