2021-2023 | PENGEMBANG SWASTA

Jakarta

1,000 Islands – Renewable Energy for Electrification Programme Phase 2

Castlerock was assigned by the client for various services within the field of grid integration of energy generation plants, whereas the client mainly deals with the simulation of action alternatives regarding the grid connection as well as the fulfilment of the prerequisites of the applicable grid codes of the respective grid operators.