Sejak didirikan pada tahun 1996, kami telah melakukan lebih dari 100 proyek penugasan di Indonesia dan di seluruh Asia, termasuk penugasan tahunan yang bernilai tinggi dengan nilai proyek lebih dari USD 8 juta. Perusahaan kami telah melayani klien lebih dari 12 negara di seluruh kawasan Asia-Pasifik, termasuk lembaga multilateral, seperti World Bank dan Asian Development Bank (ADB), lembaga bilateral seperti AFD, DFID, KfW dan USAID, perusahaan milik negara dan perusahaan multinasional.

Sektor
Tipe Klien
Tipe Layanan
Ukuran Proyek
2020-2024 | LEMBAGA PENGEMBANGAN

Indonesia Renewable Energy Program (MENTARI)

Project size BESAR

Indonesia

Castlerock Consulting provides advisory services to Palladium International Limited, as prime contractor to the UK Foreign, Commonwealth and Development Office (FCDO) for Menuju Transisi Energi Rendah (MENTARI) that represents a UK-Indonesia Low Carbon Energy Partnership. By working closely with the Government of Indonesia (GOI) and other stakeholders to improve the enabling environment and drive...

BACA SELENGKAPNYA Arrow Right
2019 | LEMBAGA PENGEMBANGAN

Southeast Asia Energy Sector Development, Investment Planning and Capacity Building Facility

Project size MEDIUM

Indonesia

The Ministry of Finance (MoF) planned to accelerate renewable energy (RE) development, particularly geothermal power. This study reviewed various incentives that could be administered by MoF to support RE development and developed an RE subsidy framework to close the gap between the costs of renewable power and conventional power generation, taking into account the...

BACA SELENGKAPNYA Arrow Right
2019-2020 | LEMBAGA PENGEMBANGAN

Consultancy Services to Support the Development of Water Supply Roadmap Policy Note and Framework for Regional Water Supply and Public Private Partnership (PPP) in Water Supply Sector

Project size KECIL

Indonesia

Under this 2019-2020 assignment funded by the World Bank, an assessment was made of impact of new regulations in the water sector and of national water assets. Following this,  options were identified for the National Water Agency and for a new MPWH structure.

BACA SELENGKAPNYA Arrow Right
2018-2019 | PENGEMBANG SWASTA

Indonesia Repowering Due Diligence

Project size KECIL

Indonesia

Castlerock was assigned by a private developer to conduct the followings: Power and Gas Market Reviews. Assisting in data collection on the existing and future power market. Assessment Study on Existing Power Plants. Assisting in data collection including current plants and their configurations, fuel types, load factors and other characteristics as required for screening...