Kredensial Proyek Kami

Sejak didirikan pada tahun 1996, kami telah melakukan lebih dari 100 proyek penugasan di Indonesia dan di seluruh Asia, termasuk penugasan tahunan yang bernilai tinggi dengan nilai proyek lebih dari USD 8 juta. Perusahaan kami telah melayani klien lebih dari 12 negara di seluruh kawasan Asia-Pasifik, termasuk lembaga multilateral, seperti World Bank dan Asian Development Bank (ADB), lembaga bilateral seperti AFD, DFID, KfW dan USAID, perusahaan milik negara dan perusahaan multinasional.

Sektor
Tipe Klien
Tipe Layanan
Ukuran Proyek
2018-2019 | LEMBAGA PENGEMBANGAN

Sustainable Infrastructure Assistance Program – Indonesia Energy Sector Assessment and Priorities 2020–2024

Project size BESAR

Indonesia

Under this 2018-2019 ADB  assignment, Castlerock prepared  an Energy Sector Assessment and Priorities “white paper” to serve as Bappenas’ background reference paper for the energy sections of Indonesia’s Medium-Term Development Plan 2020-2024. The project covered all segments of the energy value chain, from primary energy production to transformation and end-use. It covers primary energy,...

BACA SELENGKAPNYA Arrow Right
2018 | PEMERINTAH & UTILITAS

Economic Modelling and Policy Drafting (APEC Integrated Energy System Planning for Equitable Access to Sustainable Energy for Remote Communities in the APEC Regions Using North Sulawesi as a Pilot Project)

Project size MEDIUM

Sulawesi

This 2018 assignment aimed to provide a robust and practical model to assist policy makers and local stakeholders in North Sulawesi for preparing a Regional Electricity Plan provided an analytical framework that can be adopted by regional governments elsewhere in Indonesia and other APEC member countries for energy policy making. Castlerock developed a least-cost...

BACA SELENGKAPNYA Arrow Right
2017-2018 | PENGEMBANG SWASTA

Power Development Papua

Project size KECIL

Papua Province

Electric Vine Industries (EVI) signed a joint venture partnership with ENGIE and was supported by Anekatek (AE). The joint venture aims to develop, finance, build, operate and maintain photovoltaic smart microgrids to serve approximately 2.5 million people across the Province of Papua, providing sustainable 24/7 Alternating Current electricity to 3,000 Desa over a period of...

BACA SELENGKAPNYA Arrow Right
2017-2018 | PENGEMBANG SWASTA

Pre-Feasibility Study and Feasibility of Waste-to-Energy Project in the City of Bau-bau and in the Regency of Bima

Project size KECIL

Sulawesi

Castlerock conducted for project developers PT. Kaltimex Energy, a 2017-2018 prefeasibility study a $20 million Waste-to-Energy project to be executed on a BOOT basis. The project specification included Pyrolysis and/or fermentation process technology.

BACA SELENGKAPNYA Arrow Right
2017 | PENGEMBANG SWASTA

Sulse MHPP Dispatch Review

Project size KECIL

Sulawesi

Castlerock conducted a review in 2015 of three mini-hydro power IPP projects located In South Sulawesi for a US based investor considering equity investment. The review assessed economic and regulatory factors impacting PLN’s decisions on whether to dispatch the plants under a Power Purchase Agreement regime without take or pay / availability payment obligations....

BACA SELENGKAPNYA Arrow Right