Support for Independent Review of the Economic Viability of the Java Sumatra HVDC Link
Java and Sumatra
This 2016-2017 economic assessment to PT PLN was undertaken for an HVDC interconnection between Java and Sumatera using the power systems planning model Plexos. PLN has planned to develop a high voltage direct current (HVDC) transmission line to connect the Java and Sumatera grids with 3,000 MW of power carrying capacity and a cost...
BACA SELENGKAPNYA