Kredensial Proyek Kami

Sejak didirikan pada tahun 1996, kami telah melakukan lebih dari 100 proyek penugasan di Indonesia dan di seluruh Asia, termasuk penugasan tahunan yang bernilai tinggi dengan nilai proyek lebih dari USD 8 juta. Perusahaan kami telah melayani klien lebih dari 12 negara di seluruh kawasan Asia-Pasifik, termasuk lembaga multilateral, seperti World Bank dan Asian Development Bank (ADB), lembaga bilateral seperti AFD, DFID, KfW dan USAID, perusahaan milik negara dan perusahaan multinasional.

Sektor
Tipe Klien
Tipe Layanan
Ukuran Proyek
2015-2016 | PENGEMBANG SWASTA

Asia Energy Efficiency Accelerator – Energy Efficiency Policy and Capacity Development

Project size MEDIUM

Indonesia

Existing ESCO players in Indonesia are familiar with and capable of conducting both walk-through and detailed energy audits. However, a  gap was identified from the walk-through and detailed energy audits stages to a suitable integrated IGA with its packaging of an EEP (Energy Efficiency Package) of EE measures in terms of their combined technical...

BACA SELENGKAPNYA Arrow Right
2014-2016 | LEMBAGA PENGEMBANGAN

Direct Financing of State Owned Enterprise

Project size BESAR

Indonesia

The World Bank 2014-2016 supported objectives of Direct Financing of SOE Projects included SOE eligibility; loan preparation and processing, project/program execution and monitoring, government policy priorities and financial management, capacity building Castlerock’s Task 1: Options on Institutional Mechanisms, and Procedures for Direct Financing incorporated:   Discussion with the RMD and with donors (WB, ADB, KFW,...

BACA SELENGKAPNYA Arrow Right
2014-2015 | PEMERINTAH & UTILITAS

KPMG PIP Geothermal (Loan Appraisal Services to the Geothermal Fund Facility (GFF) in Pusat Investasi Pemerintah (PIP), Indonesia)

Project size MEDIUM

Indonesia

Castlerock Consulting provided 2014-2015 loan appraisal service to Pusat Investasi Pemerintah (PIP) / DFID for potential geothermal exploration related to the Geothermal Fund Facility. Castlerock Consulting was responsible for all technical aspects required including: Reviewing the loan appraisal methodology in the GFF Management Manual from a technical perspective and, if necessary, providing inputs and...

BACA SELENGKAPNYA Arrow Right
2014 | PEMERINTAH & UTILITAS

Electricity Tarif Study

Project size KECIL

Java and Bali

This Castlerock  2014 study for Ernst & Young Shihon LLC provided a glimpse of the future of Java Bali electricity system for potential investors’ consideration. The study focused on  the existing tariff structure, demand and demand forecast, economic least cost generation plan along with the investment program which will make a basis for the...

BACA SELENGKAPNYA Arrow Right
Loading