Sejak didirikan pada tahun 1996, kami telah melakukan lebih dari 100 proyek penugasan di Indonesia dan di seluruh Asia, termasuk penugasan tahunan yang bernilai tinggi dengan nilai proyek lebih dari USD 8 juta. Perusahaan kami telah melayani klien lebih dari 12 negara di seluruh kawasan Asia-Pasifik, termasuk lembaga multilateral, seperti World Bank dan Asian Development Bank (ADB), lembaga bilateral seperti AFD, DFID, KfW dan USAID, perusahaan milik negara dan perusahaan multinasional.

Sektor
Tipe Klien
Tipe Layanan
Ukuran Proyek
2016-2019 | LEMBAGA PENGEMBANGAN

ADB Independent Verification Agent for Sustainable Energy Access in Eastern Indonesia – Electricity Grid Development Program for Sumatra

Project size BESAR

Sumatra

IVA conducted verification of PLN’s DLIs, non-DLIs and program action plan of ADB RBL/World Bank Pfor R through document checks, interview, and physical inspection. Examples of The DLIs are: numbers of new customers connected, increased sales in Gwh, extension of transmission network re-conductored, additional numbers of distribution transformers and additional length of distribution networks....

BACA SELENGKAPNYA Arrow Right
2016-2017 | LEMBAGA PENGEMBANGAN

NAMA – Green Chillers and Industrial Energy Efficiency Programme

Project size KECIL

Indonesia

Under this 2016-2017 Energy Efficiency assignment for GIZ, Castlerock supported development of options for  financial incentives for accelerating energy efficiency of building-related refrigeration and air conditioning in Indonesia. The assignment involved gathering and assessing inputs from key governmental and private sectors, stakeholder discussions, development of financial incentive options, and formulation of concrete initiatives to...

BACA SELENGKAPNYA Arrow Right
2016 | PENGEMBANG SWASTA

Geothermal Market Review

Project size BESAR

Filipina, Indonesia

Castlerock conducted an Indonesia and Philippines geothermal market study for one of Asia’s leading power developers to support said developer decision on market entry. Castlerock drafted extensive report on global trends in the geothermal market, with more detailed review of conditions in the Philippines and Indonesia, as an input to a strategic decision as...

BACA SELENGKAPNYA Arrow Right
2016 | PENGEMBANG SWASTA

GHG Emissions Calculation for Waste-to-Energy Plant in Tuas

Project size KECIL

Singapore

Castlerock, in 2016, undertook a calculation of GHG Emission for Singapore’s 6th waste to energy plant  for Enviro/Pro, the Environmental and Social  consultant for the TuasOne project operated as a 25 year BOT concession under ownership of Mitsubishi Heavy Industries. The plant capacity was 3600 tonnes per day of waste throughput The scope of...

BACA SELENGKAPNYA Arrow Right
2015-2016 | LEMBAGA PENGEMBANGAN

Indonesia Cost of Service and Tariff Study

Project size BESAR

Indonesia

Under this 2015-2016 World Bank funded Cost of Service and Tariff Study of PLN’s technical, commercial and financial performance, Castlerock was responsible for collection of data and existing studies; diagnostic; calculation of total efficient costs, LRMC and development of modelling tools; proposal of new tariff regime and system; training and transfer of tools; support...

BACA SELENGKAPNYA Arrow Right